Abdolkhan – Ahwaz Transmission Pipeline

  • Project Type

    Transmission Pipeline

  • Location

    Ahvaz

  • Client

    Central Region Oil Company

  • status

    completed

Project Introduction

This project includes the purchase and implementation of 78 kilometers of the 20-kilometer pipeline between Abdul Khan and Ahvaz, in which two Valve  stations, one Pig Launcher station, and one Pig Receiver station will also be implemented.

Its cathodic protection operation is also the responsibility of the contractor as an EPC

 

Project Specification

This line includes 81 intersections with various facilities such as roads, railways, canals, etc., most of these intersections are small canals and side roads, and the largest intersections are the Ahvaz-Shush road with an approximate width of 100 meters and the Tawana canal with an approximate width of It is 30 meters

Post a comment

Your email address will not be published. Required fields are marked *